Climate Control System Installation Begins

The new climate control components arrived and we began installation. The condenser was assembled and installed first. We then assembled the evaporator unit and began fitting it into place. During test fitting, we identified a clearance concern with the heating element and blend door motor using the original mounting configuration. We're evaluating whether to modify the brackets or use an alternative heating approach. The evaporator unit remains partially installed while we finalize that decision.